The High Court has issued notices to the Goa government and other respondents in a Public Interest Litigation (PIL) challenging the construction and operation of an asphalt and hot mix plant at Petkem, Dharbandora. The High Court has also directed the respondents not to operate the plant until further orders.
The PIL alleges widespread environmental degradation, grave public health hazards, and gross regulatory non-compliance.
The respondents named in the petition include the State of Goa, the Goa State Pollution Control Board (GSPCB), the Town and Country Planning (TCP) Department, Forest Department authorities, the Dharbandora Village Panchayat, and the project proponents, M/s BAAB Construction (India) Pvt. Ltd. and M/s Bemaxit Tarring Co.
According to the petition, the industrial facility—operating at a capacity of 120 tonnes per hour (TPH) to produce asphalt concrete and bituminous metal—is located merely 25 to 30 metres from residential dwellings in the Petkem hamlet, home to members of the economically backward Dhangar community.
The plea contends that the plant directly violates the mandatory siting criteria under Entry 116, Schedule I of the Environment (Protection) Rules. The central rules require a buffer distance of at least 500 metres from human habitations, schools, colleges, and temples, and 200 metres from National or State Highways.
The petitioners pointed out that the facility falls well within the prohibited limits: Dayanand Nagar High School and Goa Multi-Faculty College are approximately 300 metres away; a primary school and the Dattatraya Temple lie within 400 metres; and National Highway 17 passes within 200 metres.
Residents have reported severe respiratory ailments, including asthma, allegedly caused by persistent emissions of dust, fly ash, thick black smoke, and acrid chemical odours. The pollution has reportedly settled on surrounding cashew, jackfruit, and mango plantations and contaminated the local open well used for drinking water. In some instances, families have been forced to cover their homes with plastic sheets and green mesh netting to keep out the heavy fallout.
The petitioners highlighted that the industrial setup spans Survey Nos. 204, 205, and 206/1 in Dharbandora village—none of which is designated as an industrial zone under the Regional Plan for Goa 2021.
Crucially, Survey No. 205 is classified as an “unclassed forest” and is zoned under the Eco-I Protected/Reserve Forest category.
Furthermore, the plea states that the plant was built and operated without technical clearance from the TCP Department, without a mandatory construction licence, and without factory permissions under the Goa Panchayat Raj Act, 1994. It is asserted that the provisional No Objection Certificate issued by the local panchayat on November 14, 2023, is void and lacks statutory foundation.
Directing the respondents to file their replies, the High Court has posted the matter for hearing on November 30.